Detail Work to Begin At Lofts
The Schroeder Lofts are nearly finished on the outside. The brickwork is essentially finished and most of the windows are going in. Now its time for the detailed accessories. We're assuming the holes in the brickwork above the future garage doors are not mistakes but instead were punched out for the installation of some decoration or lighting equipment.
All but the last six inches of the facade have been bricked over; windows will probably be going in next week.
The front of the building with the rather impressive four story window units.
All but the last six inches of the facade have been bricked over; windows will probably be going in next week.
The front of the building with the rather impressive four story window units.
Labels: Schroeder Lofts
0 Comments:
Post a Comment
<< Home